Rheintal-Garage, Chur

Starting situation and idea

A new automobile garage was built in 1999 on Chur’s automobile mile, on Rossboden. In 2010 adjustments were impleted.

Approach

Two additional showrooms with display windows facing Rossbodenstrasse could be realised by extending the existing structure of the showroom wing. The additional working spaces and staff rooms were positioned at the rear of the building in the continuation of the car workshop.

Challenges

The change of automobile brand involved building additional showrooms and other working spaces. A master plan was drawn up showing the potential of a large automotive centre showcasing three brands in addition to a used car showroom.

Keyfacts

Developer: Rheintal-Garage Chur AG, Chur
Completion: 2000 / 2014
Project type: Teilerneuerung, Extension, New structure
Project author: Fanzun AG
Construction costs: not publ.
Scope of services: Design, Quality Assurance, Project Management, Commissioning, Architecture, General Planning, Civil Engineering, Area Development, Structural Engineering, Strategy, Acoustics, Energy, Guidance, Overall Supervision, Construction Management, Cost Planning, Bids & Tenders, Construction Supervision, Development, Cost Control, Feasibility Studies, Scheduling