Benutzername
Passwort
Angemeldet bleiben
Fanzun was awarded the general planning contract based on a competition for a study.
The structure is built around an RCC skeleton with prefabricated roof and façade elements. Energy for heating and hot water supply is derived from pellets. When it was inaugurated, REKA Disentis was the largest Swiss holiday community built to comply with Minergie standards.
The client had very definite ideas of how the buildings should look based on other holiday villages which the client had commissioned. The energy footprint of the entire holiday village including six residential buildings, a community centre and a swimming pool was to be optimised.
Developer: Schweizer Reisekasse Genossenschaft, BernCompletion: 2005Project type: New structureProject author: Fanzun AGConstruction costs: CHF 27 MilScope of services: Design, Project Management, Civil Engineering, Construction Management, General Planning
Download opens in new window - please do not close and wait until the PDF has been generated.
Dies kann etwas dauern.