Benutzername
Passwort
Angemeldet bleiben
Widening cracks in the cupola worried the congregation. An analysis conducted by Fanzun revealed that the roof truss was incorrectly altered during renovation in the 1960s. The resulting horizontal stresses split open the external masonry.
After restoring the roof truss, a three-dimensional steel frame was installed to hold together the two longitudinal facades and absorb the horizontal strain. The wooden roof truss was replaced, and the façade restored. The mural in the main entrance of the church was also restored.
The slender, tall nave stood without any visible struts in the interior. The congregation and the conservation authority therefore wished to neutralise the horizontal forces in the roof truss, which was a big challenge.
Developer: Kirchgemeinde, BrusioCompletion: 2001Project type: RestorationProject author: Fanzun AGConstruction costs: CHF 1,3 MilScope of services: Feasibility Studies, General Planning, Design, Project Management, Architecture, Civil Engineering, Guidance, Overall Supervision, Construction Management, Cost Planning, Bids & Tenders, Construction Supervision, Cost Control, Scheduling, Quality Assurance, Development, Commissioning
Download opens in new window - please do not close and wait until the PDF has been generated.
Dies kann etwas dauern.